Home Energy Storage Line: Unloading, Move-in and Installation
Unloading, move-in, mechanical installation and electrical work for a new production line at a home energy storage manufacturer's California plant, completed over three months.
The challenge
The line combined robot cells, safety fencing, conveyors and a battery module line. Equipment arrived in large batches, several trades had to work in the plant at once, and each section had to be ready for the manufacturer to commission on schedule.
What we did
- 01Crane unloading, uncrating and inventory of equipment and parts
- 02Moving equipment into the plant and setting it to the layout
- 03Mechanical installation of robot cells, safety fencing and conveyors
- 04Electrical wiring between machines